Changes between Version 38 and Version 39 of SavinGroup/MergedBeams
- Timestamp:
- 10/07/09 11:57:44 (17 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SavinGroup/MergedBeams
v38 v39 34 34 In yellow you see the fiducial positions of our [https://docs.astro.columbia.edu/wiki/SavinGroup/MergedBeams/FirstLeg#BPM Beam profile wire scanner], i.e. when the wire is going through the center of the beamline. The collector signal obtained when the wire actually crosses the beam is shown in blue. 35 35 Transport of the beam is not bad at all. After some more changes of the setup (Steerers, slits, retractable cup, ...) we now have the first leg complete and get 14 micro Amps about where we'll put the spherical deflector. 36 [[br]] 36 37 [[br]] 37 38 == Laboratory Hazards ==
