Changes between Version 34 and Version 35 of SavinGroup/MergedBeams


Ignore:
Timestamp:
10/07/09 11:33:24 (17 years ago)
Author:
kmiller@…
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • SavinGroup/MergedBeams

    v34 v35  
    88
    99
    10 Transport of the beam is not bad at all. After some more changes of the setup (Steerers, slits, retractable cup, ...) we now have the first leg complete and get 14 micro Amps about where we'll put the spherical deflector.
     10
    1111
    1212== Experimental setup ==
    … …  
    3030
    3131In yellow you see the fiducial positions of our [https://docs.astro.columbia.edu/wiki/SavinGroup/MergedBeams/FirstLeg#BPM Beam profile wire scanner], i.e. when the wire is going through the center of the beamline. The collector signal obtained when the wire actually crosses the beam is shown in blue.
    32 
     32Transport of the beam is not bad at all. After some more changes of the setup (Steerers, slits, retractable cup, ...) we now have the first leg complete and get 14 micro Amps about where we'll put the spherical deflector.
    3333
    3434== Laboratory Hazards ==