Changes between Version 21 and Version 22 of SavinGroup/MergedBeams/SourceSection
- Timestamp:
- 10/07/09 11:54:08 (17 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SavinGroup/MergedBeams/SourceSection
v21 v22 33 33 resistance, then it is time to make a new filament. The filment re-dipping should be done in a well ventilated area due to the fumes from the dip. 34 34 The filament will simply be briefly put into the coating dip, then heated with a heat gun to dry. This should be repeated about 3 times. 35 After the filament has dried it can be put back into the source. The source will take some time until it is able to get back to typical base pressures of order of35 After the filament has dried it can be put back into the source. The source will take some time (about 12 hours) until it is able to get back to typical base pressures of order of 36 36 10^-7^ Torr. 37 37 [[br]]
