Changes between Version 20 and Version 21 of SavinGroup/MergedBeams/SourceSection


Ignore:
Timestamp:
10/07/09 11:53:32 (17 years ago)
Author:
kmiller@…
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • SavinGroup/MergedBeams/SourceSection

    v20 v21  
    2929after about 2-3 months of running (depending on amount of use). As time goes on and the coating wears out the source
    3030will need more arc current and source gas (H2) to maintain beam magnitude. When the coating is really worn out you will not
    31 be able to start a plasma.
     31be able to start a plasma. Renewing the filament coating is usually referred to as "re-dipping the filament". The source is vented up
     32to room air pressure (make sure to turn off the hot ion guage attached to the source turbo pump before!). Then the Faraday Cage is removed and the Filament element is unscrewed from the back. When this is removed the filament should have its resistance tested to make sure that it is not corroded. If there is significant
     33resistance, then it is time to make a new filament. The filment re-dipping should be done in a well ventilated area due to the fumes from the dip.
     34The filament will simply be briefly put into the coating dip, then heated with a heat gun to dry. This should be repeated about 3 times.
     35After the filament has dried it can be put back into the source. The source will take some time until it is able to get back to typical base pressures of order of
     3610^-7^ Torr.
    3237[[br]]
    3338[[br]]